2025-05-0366108 KB9页50
2025-05-0366285.5 KB32页32
2025-05-036690.5 KB6页49
2025-05-036654 KB4页12
2025-05-046619 KB1页21
2025-05-046655 KB3页45
2025-05-0466256.5 KB31页41
2025-05-046621.5 KB5页18
2025-05-046630.5 KB9页32
2025-05-046656.5 KB6页26
2025-05-0566137 KB24页38
2025-05-05662.37 MB189页48
0.总结1/1305/05/2025艾矿成本结构分析663,629吨0.单位成本分析总结序项目发生差异的原因说明年度总费用吨成本年度总费用吨成本年度总费用吨成本1.固定资产折旧分摊1,744,516.004.00003,829,733.335.7709-2,085,217.33-1.772.管理费用分摊3,799,840.435.72143,799,840.435.7259+0.00-0.003.维修费用分摊501,201.510.7600501,201.510.7552+0.00+0.004.直接变动成本4,208,327.116.69004,208,327.116.3414+0.00+0.355.其他费用分摊... 2025-05-056684 KB13页24
2025-05-0566213.11 KB5页42
2025-05-076634.5 KB7页50
2025-05-076622.5 KB2页22
2025-05-076620.5 KB2页25
2025-03-0666791.5 KB87页36
2025-04-236659 KB3页11
2025-04-2866396.5 KB68页30