2025-05-04203236.09 KB8页24
2025-05-041841.68 MB243页24
2025-05-041354.33 MB243页24
2025-05-04190782 KB70页24
2025-05-0412743.5 KB1页24
2025-05-041874.72 KB3页24
2025-05-04688.92 KB3页24
2025-05-0488203.5 KB20页24
2025-05-046929 KB3页24
2025-05-04123222.12 KB23页24
2025-05-0615543 KB6页24
2025-05-05883.87 MB133页24
2025-05-05158305 KB64页24
2025-05-05115711.5 KB41页24
2025-05-05154665 KB37页24
2025-05-051981.73 MB136页24
2025-05-0578195 KB64页24
2025-05-058255.5 KB21页24
2025-05-05205214.71 KB3页24
0.总结1/1305/05/2025艾矿成本结构分析663,629吨0.单位成本分析总结序项目发生差异的原因说明年度总费用吨成本年度总费用吨成本年度总费用吨成本1.固定资产折旧分摊1,744,516.004.00003,829,733.335.7709-2,085,217.33-1.772.管理费用分摊3,799,840.435.72143,799,840.435.7259+0.00-0.003.维修费用分摊501,201.510.7600501,201.510.7552+0.00+0.004.直接变动成本4,208,327.116.69004,208,327.116.3414+0.00+0.355.其他费用分摊... 2025-05-056484 KB13页24