2025-05-0562109.5 KB29页41
2025-05-05106609 KB80页42
2025-05-0510245 KB1页38
2025-05-059318.5 KB3页45
2025-05-05188149.5 KB4页42
2025-05-0519986.5 KB37页47
2025-05-057324 KB3页36
2025-05-0514922.5 KB5页35
2025-05-05852.89 MB458页23
2025-05-0517288 KB2页23
2025-05-0519524.5 KB8页30
2025-05-05144221 KB31页29
2025-05-0520223.5 KB2页48
0.总结1/1305/05/2025艾矿成本结构分析663,629吨0.单位成本分析总结序项目发生差异的原因说明年度总费用吨成本年度总费用吨成本年度总费用吨成本1.固定资产折旧分摊1,744,516.004.00003,829,733.335.7709-2,085,217.33-1.772.管理费用分摊3,799,840.435.72143,799,840.435.7259+0.00-0.003.维修费用分摊501,201.510.7600501,201.510.7552+0.00+0.004.直接变动成本4,208,327.116.69004,208,327.116.3414+0.00+0.355.其他费用分摊... 2025-05-056684 KB13页24
2025-05-055645 KB8页14
2025-05-058057 KB10页27
2025-05-0517443 KB2页30
2025-05-05199136 KB13页11
2025-05-051022.66 MB94页49
2025-05-0566213.11 KB5页42