标签“管翅”的相关文档,共3条
  • 2002年11月管翅式材料消耗定额.xls

    2002年11月管翅式材料消耗定额.xlsVIP

    管翅式产品材料耗用计划序号材料标准消耗量标准重量废品率计划耗用量计划耗用量备注(根、只)(根、只)15185.735%5445.025415.925%5686.731578.595%1657.541813.545%1904.25881.45%925.562799.685%2939.7767683%6971GDI860723%6254938163%39301034563%35601138163%393012253443%261041317763%182914138243%142391588323%90971635523%365917156003%1606818616563%6350619294241%2971820134401%1357421187921%1898022156001%157...

    2025-05-0417720.5 KB38
  • 管翅式产品成本表.xls

    管翅式产品成本表.xlsVIP

    单产位量定额合计分配分配金额定额合计分配定额合计分配分配金额定额合计分配分配金额26*152B只1506.691,003.501689.010.78117.00725.570.1116.50103.700.94141.00721.713239.99只289710.5330,505.4151344.240.792288.6314192.850.11318.672002.840.952752.1514086.8581626.7832*203A只-1659.75-1,608.75-2707.720.79-130.35-808.360.11-18.15-114.070.95-156.75-802.32-4432.4744*203B只65912.318,112.2913653.950.80527.20326...

    2025-05-04155383.5 KB44
  • 一分厂一工段长、二分厂管翅车间主任调研笔录.doc

    一分厂一工段长、二分厂管翅车间主任调研笔录.docVIP

    一分厂一工段长、二分厂管翅车间主任调研笔录曹段长:1、生产计划、分厂、每个工段的日投产量确定(根据真空炉的制造量),工段安排日生产量。一次做6天的工作量。2、根据生产计划去领料,每天领料,领料工段长审核,在制造部审核,出领料单,两联。入库,产品流转卡,入库单,流转卡结账。3、生产管理日产生产安排,安全、卫生、保养4、问题(1)技术力量薄弱。机修、设备改造等(2)日常考核陈主任1、生产计划的制定有一定的...

    2025-05-047319 KB26
确认删除?
知识变现
客服电话
客服微信
  • 客服微信
客服QQ
  • 客服QQ点击这里给我发消息
发送邮件
回到顶部